Gas Treatment Plant

The gas treatment plant will be located in Prudhoe Bay near existing oil and gas infrastructure. The plant would be comprised of three process trains to remove impurities from the natural gas that could flow from the Point Thomson and Prudhoe Bay reservoirs. Carbon dioxide would be removed, captured, and compressed for reinjection into the Prudhoe Bay reservoirs. Highlights about the gas treatment plant include:

  • An average daily capacity of 3.5 billion cubic feet; maximum capacity of 3.9 billion cubic feet per day.
  • Located on 200+ acres near existing Prudhoe Bay production.
  • Gas cleaned, dehydrated, and compressed.